City logo and web banner

Public_Works / General Bid Procurement

Project Number: 14-34
General Information
Due Date:September 25, 2014
Opening Time:2 p.m.
Published Date:August 29, 2014
Last Updated:August 29, 2014
Bid Orientation:N/A
Description:WESTON RANCH TREE TRIMMING Project No. 14-34 is for the trimming of approximately 1,100 street landscaping trees in the Weston Ranch Community.
Award Date:
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372susan.christy@stocktongov.com
Questions & Answers:
Document:Prevailing Wage Determinations 8-29-2014
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice Inviting Bids
Specifications:
Document:Project Specifications
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Project Map

 


 

Project Number: 14-32
General Information
Due Date:September 11, 2014
Opening Time:2 p.m.
Published Date:August 29, 2014
Last Updated:August 29, 2014
Bid Orientation:N/A
Description:2015 PARKS PEST CONTROL (Re-Bid) Multi-year pest control services for various City of Stockton parks, open spaces and street landscaping.
Award Date:
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Local Business Preferencelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372susan.christy@stocktongov.com
Alternate Project ManagerBrad Mettler(209) 937-7261 brad.mettler@stocktongov.com
Questions & Answers:
Document:Prevailing Wage Determination 8-29-2014
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice Inviting Bids
Specifications:
Document:Project Specifications
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms

 


 

Project Number: PW-14-33
General Information
Due Date:August 21, 2014
Opening Time:2 p.m.
Published Date:August 07, 2014
Last Updated:August 20, 2014
Bid Orientation:N/A
Description:2015 TREE REMOVAL SERVICES Tree removal throughout the City of Stockton
Award Date:
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinations link
Contacts:
Role:Name:Phone:Email:
Project ManagerMelissa Bowen(209) 937-8283melissa.bowen@stocktongov.com
Project Manager (alternate)Trina Manzer(209) 937-7412trina.manzer@stocktongov.com
Submittals:
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Planholder's List
Specifications:
Document:Project Specifications
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms

 


 

Project Number: 14-30
General Information
Due Date:July 24, 2014
Opening Time:2 p.m.
Published Date:July 08, 2014
Last Updated:July 28, 2014
Bid Orientation:Mandatory Pre-Bid meeting Tuesday, July 15, 2014 at 10 a.m. at the Municipal Service Center, 1465 So. Lincoln Street, Stockton, CA 95206
Description:2014 LED ARTERIAL STREET LIGHT CONVERSION PROJECT NO. PW 14-30. Install 2,500 LED Street Lights on City of Stockton arterial roadways
Award Date:
Related Links:
Description:URL:
Local Employment Ordinancelink
Local Business Preferencelink
State Wage Rateslink
Insurance Rateslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372susan.christy@stocktongov.com
Job Walk & Plan Holder's List:
Document:Planholder's List
Specifications:
Document:Bid Specifications
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Bid Forms

 


 

Project Number: PW-12-06
General Information
Due Date:July 17, 2014
Opening Time:2:00 p.m.
Published Date:June 19, 2014
Last Updated:June 18, 2014
Bid Orientation:n/a
Description:PROJECT - SAFE ROUTES TO SCHOOL PILOT PROGRAM EXTENSION
The City of Stockton is issuing this Request for Proposals (RFP) to hire a qualified consultant (Pilot Program Education Encouragement Coordinator) to help manage and implement Stockton's SRTS Pilot Program for the Public Works Department
Award Date:
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerSharla Hardy(209) 937-8374Sharla.Hardy@stocktongov.com
Questions & Answers:UPDATED
Document:Questions and Answers
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
Document:Request for Proposals

 


 

Project Number: 13-17
General Information
Due Date:July 10, 2014
Opening Time:2:00 PM
Published Date:June 11, 2014
Last Updated:June 20, 2014
Bid Orientation:N/A
Description:WILSON WAY ADA IMPROVEMENTS
Construct ADA compliant wheelchair ramps at the northeast and southeast ends of the Wilson Way underpass between Dr. Martin Luther King Jr. Blvd. and Hazelton Ave. Include crosswalks across frontage road parallel to Wilson Way and mid-block wheelchair ramps on frontage road sidewalk.
THE BID DOCUMENTS WILL BE POSTED NO LATER THAN FRIDAY, JUNE 20th. A LETTER OF CLARIFICATION WILL ALSO BE ISSUED REGARDING A NEW BID OPENING DATE.
Award Date:
Related Links:
Description:URL:
Local Employment Ordinancelink
Local Business Preferencelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSharla Hardy(209) 937-8374Sharla.Hardy@stocktongov.com
Planholder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Submittals:
Document:Bid Comparison
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Planholder's List (as of 7-10-14)
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: PW11-24
General Information
Due Date:July 03, 2014
Opening Time:2:00 PM
Published Date:May 15, 2014
Last Updated:June 17, 2014
Bid Orientation:N/A
Description:CESAR CHAVEZ LIBRARY HVAC CONTROLS
Upgrade pneumatic controls with a Direct Digital Control system for Heating, Ventilating, and Air Conditioning.
Award Date:
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerAlex Martinez(209) 937-8055Alex.Martinez@stocktongov.com
Planholder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Vicinity Map
Document:Job Walk Sign-In Sheet
Document:Planholder's List
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Plans, Attachments & Agendas:UPDATED
Document:Bid Forms
Document:Plans
Document:HazMat Report
Document:Attachment A
Document:Attachment B

 


 

Project Number: M09096
General Information
Due Date:July 03, 2014
Opening Time:2:00 p.m.
Published Date:June 05, 2014
Last Updated:June 04, 2014
Bid Orientation:N/A
Description:RALPH AVENUE SEWER REHABILITATION PROJCT - PHASE I (Airport Way to B Street)
Install approximately 3,343-feet of 30-inch sewer line trunk line by cured-in-place along Ralph Avenue between Airport Way and B Street. Work also includes, temporary sewer bypassing, CCTV, reconnection of service laterals and other work items necessary to do the work
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Questions & Answers:
Document:Questions and Answers
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Specifications:
Document:Instruction to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans

 


 

Project Number: 11-03_Federal-Project-STPLR-7500-185
General Information
Due Date:May 29, 2014
Opening Time:2:00 PM
Published Date:May 01, 2014
Last Updated:May 01, 2014
Bid Orientation:May 22, 2014, 10:00 AM
Description:HAZELTON AVENUE AND UPRR CROSSING SAFETY IMPROVEMENTS
Work primarily consists of installation of curb, gutter, sidewalks, driveways, ADA compliant ramps, raised median, stamped concrete, pedestrian guardrails, pavement striping, and markings. Also includes demolition, grading, adjustments to grade of utility valves, covers, and monument wells, hydrant relocation, AC paving and temporary traffic control. Will need coordination with UPRR when installing UPRR’s warning devices.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction Demolition/Recycling Plan/Reportlink
UPRR Permit Informationlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project EngineerCliff Gayotin(209) 937-8241Cliff.Gayotin@stocktongov.com
Planholder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans

 


 

Project Number: M13001
General Information
Due Date:April 24, 2014
Opening Time:2:00 PM
Published Date:March 27, 2014
Last Updated:March 27, 2014
Bid Orientation:No pre-bid meeting
Description:2013 SANITARY SEWER REHABILITATION PROJECT
Install approximately 1,201-feet of 8-inch sewer line by pipe bursting, 276-feet of 10-inch sewer line by pipe bursting, 1,696-feet of 6-inch by cured-in-place, 478-feet of 8-inch by cured-in-place, 12-feet of 12-inch by open cut and 203-feet of 8-inch by horizontal directional drilling throughout the City of Stockton. Work also includes temporary sewer bypassing, CCTV, reconnection of service laterals and other work items necessary to do the work.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Plan Holders ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Submittals:
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List (as of 4-23-14)
Specifications:
Document:Instructions to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans

 


 

Project Number: PW-12-04-FEDERAL-PROJECT-CML-5008-113
General Information
Due Date:April 10, 2014
Opening Time:2:00 p,m.
Published Date:March 13, 2014
Last Updated:March 13, 2014
Bid Orientation:March 27, 2014, 10:00 a.m.
Description:WILSON WAY ADAPTIVE TRAFFIC CONTROL SYSTEM
Install the Adaptive Traffic Control System and modify 10 traffic signals along Wilson Way between Waterloo Road and Anderson Street. Construct left turn lanes at the intersection of Wilson Way and Anderson Street
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep209-937-8825Dennis.Yep@stocktongov.com
Plan Holder's List Analissa Nunez209-937-8411Analissa.Nunez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-in Sheet
Document:Plan Holder's List
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: M04014
General Information
Due Date:April 10, 2014
Opening Time:2:00 p.m.
Published Date:March 06, 2014
Last Updated:March 12, 2014
Bid Orientation:N/A
Description:TUXEDO AVENUE SEWER REHABILITATION PROJECT
Project is located on Tuxedo Avenue between Pershing Avenue and the Smith Canal Sewer Pump Station (just west of Interstate 5). Improvements include, but are not limited to, rehabilitation of approximately 256 linear feet of 30-inch, 6,191 linear feet of 36-inch and 273 linear feet of 48-inch sewer trunk line by cured-in-place pipe. Improvements also include temporary traffic control, temporary bypassing, and all incidentals to complete the project as per the attached plans and special provisions (specifications).
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8411analissa.nunez@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Specifications:
Document:DBE Compliance Guidelines
Document:DBE Forms
Document:Instruction to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: M06015
General Information
Due Date:March 20, 2014
Opening Time:2:00 p.m.
Published Date:February 20, 2014
Last Updated:February 20, 2014
Bid Orientation:N/A
Description:HAZELTON DIVERSION STRUCTURE
Remove existing 36-inch sewer line, backfill existing junction box with control density and install two manholes, flexible couplings and 24-inch and 36-inch sewer lines.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project Manager Rosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8411Analissa.Nunez@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Specifications:
Document:Special Provisions
Document:Instruction to Bidders
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Form Package

 


 

Project Number: PW-14-01
General Information
Due Date:January 16, 2014
Opening Time:2:00 p.m.
Published Date:December 19, 2013
Last Updated:December 19, 2013
Bid Orientation:N/A
Description:2014 SPEED HUMP, SPEED CUSHION, AND SPEED TABLE PROJECT
Construct asphalt concrete speed humps, speed cushions, and speed tables over existing pavement install City furnished thermoplastic chevrons, diamonds, and pavement markings as necessary install City furnished warning and advisory signs at each location, includes bases, posts, and rivets. Project is an annual contract for construction of speed humps/cushions/tables in multiple phases over the calendar year 2014. It is estimated that speed humps/cushions/tables may be installed at 150 to 200 locations by Contractor in the combined Phases.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerShirley Arnett(209) 937-5136Shirley.Arnett@stocktongov.com
Planholder's ListAnalissa Nunez(209) 937-8411Analissa.Nunez@stocktogov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Specifications:
Document:Special Provisions
Document:Instruction to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms

 


 

Project Number: PW-09-02-Federal-Project-RSTPLE-5008-122
General Information
Due Date:October 31, 2013
Opening Time:2:00 p.m.
Published Date:October 10, 2013
Last Updated:November 06, 2013
Bid Orientation:October 24, 2013, 10:00 a.m., 425 N. El Dorado Street, 2nd floor, Council Chambers
Description:WEBER AVENUE STREETSCAPE BEAUTIFICATION PROJECT, PHASE 2- Project is located on Weber Avenue, approximately between Stanislaus Street and the Union Pacific Railroad at-grade crossing. Improvements will install new sidewalks, landscaped medians, and street amenities, such as benches, trash receptacles, and streetlights. Improvements also include roadway pavement, a signal modification, and storm drainage upgrades.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJodi Almassy209-937-8299Jodi.almassy@stocktongov.com
Planholders ListNancy Arbios209-937-8114Nancy.arbios@stocktongov.com
Submittals:UPDATED
Document:Revised Bid Abstract
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Plan Holders List
Plans, Attachments & Agendas:
Document:Plans
Document:Geotechnical Report
Document:Bid Forms

 


 

Project Number: M09106
General Information
Due Date:October 24, 2013
Opening Time:2:00 p.m.
Published Date:September 26, 2013
Last Updated:October 24, 2013
Bid Orientation:N/A
Description:ARCH ROAD SANITARY SEWER TRUNK LINE
Install approximately 7,400 linear feet of 30-inch sewer trunk line within the existing Arch Road right of way from the existing Sewer Pump Station (just east of SR99 Frontage Road) to Austin Road. In general, work includes, but is not limited to: installation of approximately 7,400 linear feet of 30-inch sewer trunk line within the existing City right of way and an alternate bid of approximately 2,600 linear feet of 27-inch sewer trunk line within the County right of way along Arch Road. Work also includes all incidentals to complete the project as paer the attached plans and special provisions (specifications),
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project EngineerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktongov.com
Planholder's ListAnalissa Nunez(209) 937-8411Analissa.Nunez@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Specifications:
Document:Special Provisions
Document:Instruction to Bidders
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: 13-22
General Information
Due Date:October 03, 2013
Opening Time:2:00 p.m.
Published Date:September 12, 2013
Last Updated:September 12, 2013
Bid Orientation:September 24, 2013, 9:00 a.m.
Description:ELECTRIC POWER GATES AT FIRE STATIONS #2 #4
Install electric rolling gate with Fire Strobe access control at Fire Station #2 and dual-swinging electric gate with Fire Strobe access control at Fire Station #4.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project EngineerAlex Martinez(209) 937-8055Alex.Martinez@stocktongov.com
Planholder's ListAnalissa Nunez(209) 937-8411Analissa.Nunez@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1
Submittals:
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holder's List
Document:Job Walk Sign-In Sheet
Notice:UPDATED
Document:Notice Inviting Bids
Document:Notice to Contractors
Specifications:
Document:Special Provisions
Document:Instruction to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Vicinity Map

 


 

Project Number: PW-13-09
General Information
Due Date:July 11, 2013
Opening Time:2:00 PM
Published Date:May 30, 2013
Last Updated:July 09, 2013
Bid Orientation:June 13, 2013, 10:00 a.m.
Description:CITY OF STOCKTON IT DEPARTMENT RELOCATION PROJECT
Perform tenant improvements, including but not limited to architectural, mechanical, electrical, and plumbing components as described in the Plans and Specifications to accommodate the relocation of the City of Stockton's Information Technology Division.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project EngineerWes Johnson(209) 937-8088Wes.Johnson@stocktongov.com
Planholders ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Job Walk & Plan Holder's List:
Document:Job Walk Sign-In Sheet
Document:Plan Holder's List (as of 7-10-13)
Specifications:
Document:Specifications
Document:Instruction to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms

 


 

Project Number: PW-11-28-Federal-Project-CML-5008-109
General Information
Due Date:July 11, 2013
Opening Time:2:00p.m.
Published Date:June 06, 2013
Last Updated:June 06, 2013
Bid Orientation:June 20, 2013, 10:00 a.m., 425 N. El Dorado Street, City Hall, 2nd floor, Council Chambers
Description:DAVIS ROAD AND WAGNER HEIGHTS ROAD TRAFFIC SIGNAL INSTALLATION Installation of traffic signals at the intersection of Davis Road and Wagner Heights Road, update the curb ramps to comply with ADA Standards, and install fiber optic interconnection to the intersection of Davis Road and Wagner Heights Road.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project EngineerDennis Yep(209) 937-8825Dennis.Yep@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1
Submittals:
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Plan Holder's List
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: PW-11-27-Federal-Project-CML-5008-110
General Information
Due Date:June 06, 2013
Opening Time:2:00 PM
Published Date:May 06, 2013
Last Updated:May 07, 2013
Bid Orientation:May 23rd, 10:00 AM, 425 N. El Dorado Street, 2nd Floor, Council Chambers
Description:BEN HOLT DRIVE and INGLEWOOD AVENUE - TRAFFIC SIGNAL AND SAFETY LIGHTING - Install traffic signal and safety lighting, update curb ramps to comply with current ADA standards, and modify the signing and pavement delineation to accommodate the traffic signal. The traffic signal will include pedestrian signal heads, emergency vehicle pre-emption, a pan tilt zoom (PTZ) video, and interconnection between the project intersection and the existing traffic signal at the intersection of Benjamin Holt Drive and Pacific Avenue.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Planholder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Submittals:
Document:Bid Abstract
Document:Columbia Electric
Document:Pacific Excavation
Document:Steiny & Company, Inc.
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Plan Holder's List
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Project Plans

 


 

Project Number: PW-11-26-Federal-Project-CML-5008-111
General Information
Due Date:June 06, 2013
Opening Time:2:00 PM
Published Date:May 06, 2013
Last Updated:May 07, 2013
Bid Orientation:May 23rd, 10:00 AM, 425 N. El Dorado Street, 2nd Floor, Council Chambers
Description:BENJAMIN HOLT DRIVE and CUMBERLAND PLACE - TRAFFIC SIGNAL AND SAFETY LIGHTING - Install traffic signal and safety lighting, update curb ramps to comply with current ADA standards, and modify the signing and pavement delineation to accommodate the traffic signal. The traffic signal will include pedestrian signal heads, emergency vehicle pre-emption, a pan tilt zoom (PTZ) video, and interconnection between the project intersection and the existing traffic signal at the intersection of Benjamin Holt Drive and Herndon Place.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Planholder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Submittals:
Document:Bid Abstract
Document:Pacific Excavation
Document:Columbia Electric
Document:Steiny & Company, Inc.
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Plan Holder's List
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Project Plans

 


 

Project Number: PW-11-05-Federal-Project-STPL-5008-112
General Information
Due Date:April 25, 2013
Opening Time:2:00 PM
Published Date:April 04, 2013
Last Updated:April 04, 2013
Bid Orientation:April 10, 2013, 10:00 a.m., 425 N. El Dorado Street, City Hall, 2nd Floor, Council Chambers
Description:AIRPORT WAY STREETSCAPE BEAUTIFICATION PROJECT, PHASE 4
Project involves frontage improvements (curb, gutter and sidewalk) and landscaping improvements along both sides of Airport Way from Tenth Street to south of Twelfth Street along the west side of Airport Way. Improvements would extend approximately 750 feet south of Twelfth Street along the east side of the street, improvements would extend approximately 200 feet south of Twelfth Street to the end of the existing residential subdivision.
Award Date:
Related Links:
Description:URL:
State Wage Ratelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJodi Almassy(209) 937-8299Jodi.Almassy@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Plan Holder's List
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms

 


 

Project Number: PW-11-04-Federal-Project-STPLR-7500-157
General Information
Due Date:April 18, 2013
Opening Time:2:00 p.m.
Published Date:March 21, 2013
Last Updated:March 21, 2013
Bid Orientation:Thursday, March 28, 2013, 10:00 a.m., 425 N. El Dorado Street, 2nd Floor, Council Chambers
Description:AURORA/BNSF RAILROAD CROSSING IMPROVEMENTS - The project will install a median island in Aurora Street, north of the BNSF crossing. Additional improvements include installation of sidewalk on west side of the street on both sides of the crossing, with truncated dome pads on both sides of the crossing, an ADA ramp south of the crossing, and a new storm drain inlet in the sidewalk on the south side of the crossing.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSharla Hardy(209) 937-8374Sharla.Hardy@stocktongov.com
Planholder's ListJanelle Taggart(209) 937-8818Janelle.Taggart@stocktongov.com
Questions & Answers:
Document:Questions, Answers, and Clarifications
Submittals:UPDATED
Document:Bid Abstract
Document:Bid Comparison
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-In Sheet
Document:Planholder's List

 


 

Project Number: PW-10-12-Federal-Project-CML-5008-098
General Information
Due Date:March 14, 2013
Opening Time:2:00 p.m.
Published Date:February 14, 2013
Last Updated:March 19, 2013
Bid Orientation:Thursday, February 28, 2013, 9:00 a.m., City Hall Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202
Description:TRAFFIC SIGNAL CONTROLLER UPGRADE AND RETIMING- Traffic signal controller upgrade at 20 existing signalized locations on March Lane, Harding Way, and Wilson Way upgrade seven traffic signal cabinets.
Award Date:
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep209-937-8825dennis.yep@stocktongov.com
Plan Holder's ListNancy Arbios209-937-8114nancy.arbios@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1
Job Walk & Plan Holder's List:
Document:Mandatory Pre-Bid Sign-In Sheets
Document:Plan Holders' List